Facility Management Tender Consulting.

My Facility Management tender consulting starts from a simple idea: a tender is won or lost in the specification document, not at the evaluation table. The specification sets the scope, the pricing unit, the service levels and the award formula: get those four pieces wrong and every bid becomes impossible to compare, so the contract ends up awarded on price alone — which is almost never what the client actually wanted.

Who this is for

For anyone who has to tender facilities services and wants the contract decided on clear criteria, not on the lowest bid or on inertia.

  • Your contract is expiring and you don’t want to renew it without benchmarking the market.
  • You’re outsourcing for the first time, or bundling several services into a single integrated contract.
  • You’re getting bids that can’t be compared with each other and you need a specification that puts them on the same footing.
  • You want to know what’s really behind each price before you sign.

When to ask for help (and when it’s already too late)

The ideal timeline starts six to nine months before the contract expires. With that much runway you can diagnose the current setup, decide on the model, write the specification, give bidders a realistic deadline and prepare the transition.

  • Nine months out: full runway. You can rethink the model instead of just reissuing the previous contract under a new name.
  • Four months out: still workable, but the model is taken as settled and the effort goes into the specification and the evaluation.
  • Two months out: only two reasonable options remain: extend the current contract long enough to do the job properly, or rush out a hurried specification and pay for it for the next four years. The extension is almost always the cheaper route.
  • Specification already published: you can still review the bid evaluation and prepare the negotiation, but you’re working within whatever room the document left you.

What I do

  1. Supplier pre-selection. A map of who can genuinely deliver that service, at that volume, to that standard, in that location. Inviting ten companies when six of them were never going to bid is just noise.
  2. Technical specification. Scope per service, service levels with their measurement method, penalty regime, reporting obligations, and transition and exit requirements. I cover this section by section in a separate guide on how to write a Facility Management technical specification.
  3. Commercial specification. Pricing structure, units of measurement, treatment of out-of-scope work, price revision and the invoicing model. This is the part that costs the most when it’s rushed.
  4. Evaluation matrix. Criteria, weightings and formulas — so the technical weighting is genuinely technical, not a box every bidder ticks.
  5. Negotiation and award. Comparative bid analysis, hard questions for every bidder, a risk table and a reasoned recommendation.
  6. Mobilization. The first-90-days plan, which is where the value of a well-run tender is usually lost.

The transition: the first 90 days

A well-awarded contract that’s badly mobilized performs worse than a mediocre one that’s mobilized well. If the specification doesn’t set out the mobilization plan and its penalties, nobody is accountable for those 90 days: I go into this in detail on transition and mobilization.

The costliest mistakes in an FM specification

MistakeWhat it causesHow to avoid it
Copying the scope from the previous contractServices that are no longer used get carried over, and ones that are needed get left outInventory and actual usage data before scope is written
KPIs with no calculation formulaThe result gets argued over every month and is never actually penalizedEvery KPI with a data source, formula, threshold and financial consequence
Price per undefined unit (m², site, hour)Bids that can’t be compared with each otherDefine the unit and publish the baseline figure for everyone
No exit or reversibility clauseLock-in: the next tender starts out already constrainedObligations to hand over data, assets and history at the end of the contract
Penalties with no cap or graduationThey get signed and then never actually appliedProgressive scale, contractual cap and automatic application
Two-week bidding windowOnly an incumbent already on the inside can respond in timeFour to six weeks, with site visits and a question-and-answer round

Public and private sector: what changes (and what doesn’t)

In the Spanish public sector, procurement is governed by Law 9/2017 on Public Sector Contracts: publicity requirements, deadlines, automatic criteria versus criteria subject to judgement, the contracting board, thresholds and appeals. None of those obligations apply in the private sector, and precisely because of that it pays to borrow much of that same discipline: criteria written down before bids are opened, a traceable decision, and a reasonable response deadline.

What stays the same in both cases: if the technical specification doesn’t describe the service level you want, you’re not going to get it.

Case study

An IFM contract worth roughly €1.5M/year across more than 220 service locations for a national distribution company: model design, technical and commercial specifications, and support throughout the entire tender process. Read the case study.