How to compare facility services costs across sites and branches: normalise first

To compare what the same service costs across different sites or branches, dividing the invoice by the number of locations is not enough. You first have to normalise: the same service definition, the same scope, the same unit of measure (square metres, site, hour or service unit, depending on the service) and the same service level. Only then do price differences mean anything, and only then can you decide which contracts to renegotiate, re-tender or consolidate.

Why are site-by-site rates almost never comparable as they stand?

In a network of branches, regional offices or stores, service contracts are usually signed over many years, with different suppliers, at different times and often by different managers. When someone finally puts every invoice into one spreadsheet, large price gaps appear between sites that supposedly receive the same service. The temptation is to conclude that some sites overpay and the rest are fine. That conclusion is almost always premature.

The gaps usually come from five sources before they come from price itself:

  • Different scope. A cleaning contract that includes windows, consumables and sanitary bins cannot be compared with one that does not.
  • Different service level. Frequencies, opening hours, reactive response times, on-site presence versus on-demand service.
  • Different unit of measure. One contract charges per square metre, another per site, another per hour, and the reference floor areas were not measured the same way.
  • Different contract terms. Signature date, whether the price review clause was applied, management fees included or billed separately.
  • Genuine local conditions. In Spain, for labour-intensive services such as cleaning, collective agreements are frequently negotiated at provincial or regional level, so the reference labour cost can differ from one territory to another. Other countries have their own equivalents. That gap is legitimate and does not disappear when contracts are consolidated.

Comparing without separating these five sources leads to two expensive mistakes: cutting where a high price is explained by a wider scope, and accepting a low price that actually reflects a service nobody is delivering.

Which unit of comparison should you use for each service?

No single unit works for everything. The practical rule is to use the unit that best explains the cost of each service, and to write it down before you start:

  • Cleaning: cost per square metre cleaned, always shown together with service hours and frequency. A price per square metre without hours hides the difference between daily cleaning and cleaning three days a week.
  • Maintenance: planned maintenance per square metre or per asset, based on the asset register; reactive maintenance always kept separate, because it depends on the condition of each building.
  • Security and reception: cost per service hour, distinguishing post type and schedule.
  • Internal mail and courier: cost per route or per delivery, depending on how the service is organised.
  • Document destruction: cost per container or per collection, together with collection frequency and the required security level.

When the unit is floor area, every site must be measured on the same basis. The International Property Measurement Standards (IPMS) exist precisely so that areas can be compared across buildings and countries. You do not have to adopt them to the letter, but you do need one area definition applied across the whole network.

Step 1: what data do you need for each site?

Before comparing prices you need a minimum baseline for each site. If the data does not exist, collecting it is the first job, and it usually takes longer than the analysis itself:

  • Site type (branch, head office, warehouse, store) and floor area measured on a common basis.
  • Opening hours and approximate occupancy.
  • Services contracted, supplier for each and contract expiry date.
  • Actual scope of each service: what the contract says and what is delivered in practice.
  • Annual spend split into fixed, variable and out-of-scope work.
  • Price review clause and the last review applied.

Step 2: how do you separate fixed, variable and out-of-scope spend?

One of the most common distortions is mixing the fixed fee with one-off work. A branch with a major HVAC failure can look expensive for a year without its contract being expensive. Compare the fixed, recurring part first, because it reflects the contracted price, and then analyse variable and out-of-scope spend as a separate question: there, what you are checking is whether the work was justified and whether it was priced at agreed unit rates.

Step 3: which sites should each site be compared with?

Comparing head office with a small local branch tells you nothing. What works is grouping sites into homogeneous families by type, size and opening hours, and comparing within each family. If you also separate them by the labour market or collective agreement that applies, you isolate the local cost effect, and what remains looks much more like a genuine price difference.

Step 4: how do you read the differences?

With normalised and grouped data, the analysis is about looking at the spread within each family and explaining the outliers, not about calculating an average and flagging everyone above it. For every site outside the band the question is the same: is the gap explained by scope, by service level, by local conditions or by price? Only the last one is a direct savings opportunity. The others are service decisions that someone has to take knowingly.

The same normalise-before-you-score logic applies when comparing bids in a tender; it is covered in how to evaluate Facility Management bids.

When does the comparison suggest consolidating contracts?

A well-run comparison usually ends with a question: should we bundle? Some signals point towards consolidation:

  • Many small suppliers delivering the same service with a homogeneous scope.
  • Price gaps that, once normalised, are explained neither by scope nor by local conditions.
  • A high internal management burden: too many contracts, invoices and expiry dates for the team that controls them.
  • Expiry dates that can be aligned without penalties.

And some point the other way. Specialist services, such as confidential document destruction or regulated security services, have their own requirements that do not always fit a bundled contract. Putting the whole network with one supplier creates dependency and weakens your position at the next renewal. And in areas with few sites, a local supplier may respond better than a national one. The middle option, bundling by service lot or by territory, is usually worth at least an analysis. When an integrated model makes sense is explained on the IFM model page. If your network opens and closes sites often, how to build those changes into the contract is covered in adding and removing sites in a multi-site FM contract.

A hypothetical example

An organisation with a branch network compares its cleaning spend and finds that some branches pay twice as much per square metre as others. Normalising reveals three things: part of the expensive branches have daily cleaning while the rest are cleaned every other day; the reference areas in several contracts do not match the real floor area; and only a small group of sites pays a clearly higher price with nothing to explain it. The decision is no longer “cut the expensive ones” but to standardise service levels by branch type, correct the areas and renegotiate or re-tender the overpriced group. The example is illustrative and does not describe a real case.

What to do on Monday morning

Pick one service, the one that weighs most in your spend, and build the baseline for ten sites of the same type: floor area, hours, actual scope, supplier, expiry date and spend split into fixed and variable. If you cannot explain the price gaps across those ten sites, the comparison of the whole network will have the same problem, multiplied.

If you run a multi-site network and want to know which contracts are out of line, Facility Management contract audit explains how I review scope, invoicing and commercial terms, and Facility Management tenders covers how a re-tender is structured, in lots or consolidated. For the follow-up control you can also read how to audit a Facility Management contract. If you would like to discuss your case, get in touch.

Hugo Gómez Crespo

Hugo Gómez Crespo

Consultor independiente de Facility Management. 16 años dentro de los grandes proveedores de IFM; hoy, al servicio de quien contrata. Miembro de IFMA España desde 2014. Trayectoria completa · LinkedIn.

Hablemos

Una conversación de 30 minutos, sin coste y sin propuesta comercial detrás, suele bastar para saber si merece la pena seguir hablando.

Hablemos